Post construction cleaning companies charge $0.10 to $0.50 per square foot, $30 to $50 per cleaner per hour, or a flat project rate, depending on debris level, project size, and the cleaning phases required. Most also set a minimum charge of $200 to $400 for small jobs. All pricing ranges cited here are general market estimates; confirm current CR Maids rates before booking.
Key Takeaways
- Three Pricing Models: Per square foot ($0.10-$0.50), hourly ($30-$50 per cleaner), or flat rate. Most common is per square foot for full builds.
- Minimum Charges: Most providers set a $200 to $400 minimum, making small jobs appear more expensive per foot.
- Debris Volume Is the Biggest Variable: Heavy silica dust, paint, and adhesive require significantly more labor than lightly finished spaces.
- Compare on Scope, Not Just Price: Confirm which phases, debris removal, and surfaces are included before comparing quotes.
- CR Maids: Post-construction cleaning across Castle Rock, Denver, Parker, and Highlands Ranch with all supplies included.
How Do Post Construction Cleaning Companies Charge?
Most companies use one of three pricing models plus a minimum. Knowing which model you are being quoted makes comparing offers significantly easier.
| Pricing Model | Typical Rate | Best For |
| Per Square Foot | $0.10 to $0.50 | Larger or full-build projects |
| Hourly | $30 to $50 per cleaner | Small or unpredictable jobs |
| Flat Rate | Single project quote | Small residential builds |
| Minimum Charge | $200 to $400 | Very small spaces |
Per-square-foot pricing is the most common for full builds because it scales predictably. Hourly suits jobs where scope is hard to estimate in advance. Flat rate is easiest to budget on a small project with a clearly defined scope.
What Drives the Price Up or Down?
Several variables move a company’s quote within the general ranges above.
Debris Volume
The most significant variable. Heavy drywall dust, paint, adhesive, and leftover materials require far more labor than a lightly finished space. Fine construction dust, particularly crystalline silica from concrete, tile, and drywall, requires careful handling and professional-grade HEPA equipment to remove safely. Per OSHA’s silica crystalline standards, silica dust must be fully removed before occupancy due to serious respiratory health risks.
Project Size and Type
Larger projects usually cost less per square foot because the work scales efficiently. Commercial builds, multi-level layouts, and specialty finishes including natural stone, hardwood, or floor-to-ceiling glass add time and require surface-specific products, which increases the total labor per square foot.
Location and Labor Market
Urban areas and regions with higher minimum wages carry higher baseline professional cleaning rates. Castle Rock and Denver are above the national average for service industry labor costs, which is reflected in local quotes compared to generic online pricing guides.
Timeline and Urgency
Same-day or last-minute bookings carry a premium. Advance bookings aligned with the construction handover timeline avoid rush pricing and allow the right crew size to be confirmed before the team arrives.
What Is Included in a Company’s Quote?
Post-construction cleaning is split into phases, and a quote should clearly state which ones it covers.
Phase 1: Rough Clean
Removes large debris and heavy dust so the space is ready for detailed cleaning. Typically performed while construction trades are still completing punch-list items.
Phase 2: Final Clean
The detailed, pre-occupancy pass covering floors, windows, fixtures, and every interior surface. This is the most commonly booked standalone phase for residential renovations. See full scope on the CR Maids post-construction cleaning page.
Phase 3: Touch-Up Clean
An optional light pass before handover to catch dust that resettles after the final clean. Common on new builds and commercial fit-outs.
A complete quote should also state whether debris haul-away, interior windows, and specialty surface care are included or billed separately. Per the ISSA cleaning industry standards, a professional post-construction scope should be documented in full before any work begins.
How Do You Compare Quotes From Different Companies?
The most common mistake is comparing a per-square-foot bid against an hourly one without normalizing them first.
Pricing Model
Confirm whether the quote is per square foot, hourly, or flat rate. Convert all quotes to a total project estimate before comparing numbers.
Phases Included
Confirm which phases are covered. A rough clean and a final clean have very different scope and cost. A quote that appears lower may simply exclude the final clean phase.
Debris Removal
Confirm whether debris haul-away is included or priced separately. Some providers quote the cleaning only and charge separately for debris disposal.
Minimum Charge
Confirm the minimum and whether it applies to your job size. On small properties, the minimum charge can make the effective per-square-foot rate significantly higher than the stated range.
Beyond the numbers, verify the company carries liability insurance and workers’ compensation. Construction sites carry more risk than a standard residential clean. Review client feedback for reliability and thoroughness, and favor transparent upfront pricing over the lowest bid, which often hides fees or excludes phases from the scope.
What Does CR Maids Charge for Post-Construction Cleaning?
CR Maids provides a transparent quote based on your square footage, the cleaning phases you need, and the debris level, so the full cost is confirmed before any work begins with no hidden additions.
What Every CR Maids Post-Construction Booking Includes
- Full Phase 2 final cleaning covering all interior rooms and surfaces.
- HEPA-grade vacuuming throughout.
- All supplies and professional-grade equipment at no extra charge.
- Background-checked and insured teams on every visit.
- Property condition report documenting any damage or maintenance issues.
- Satisfaction guarantee: any area on the agreed scope not cleaned to standard and reported within 24 hours is corrected at no extra cost.
See current pricing before booking. Read what Castle Rock and Denver clients say on the CR Maids reviews page. Many clients pair the post-construction final clean with a deep cleaning or move-in session to prepare the space fully before occupancy.
The Bottom Line on What Post Construction Cleaning Companies Charge
Post construction cleaning companies charge $0.10 to $0.50 per square foot, $30 to $50 hourly, or a flat project rate. Minimum charges of $200 to $400 apply on most small jobs. Debris volume and specialty surfaces are the two biggest variables within those ranges. Compare quotes on scope, phases, and debris removal, not just the total number. CR Maids is a woman-owned cleaning company serving Castle Rock, Parker, Highlands Ranch, Centennial, Littleton, Lone Tree, and Denver with all supplies included and a satisfaction guarantee on every booking.
Book Your Post-Construction Cleaning Today
Book your post-construction cleaning today or call 720-713-1920 for a quote on your specific project and debris level.
Frequently Asked Questions
1. How much do post-construction cleaning companies charge on average?
Most charge $0.10 to $0.50 per square foot, $30 to $50 per cleaner per hour, or a flat project rate, with a $200 to $400 minimum. Debris level and phases required determine where your job falls within those ranges.
2. Why do companies charge a minimum fee?
A minimum covers setup, travel, equipment, and labor that apply to any job regardless of size. On a small space, that minimum makes the effective per-square-foot rate appear higher than on a large build.
3. Is per-square-foot or hourly pricing cheaper?
It depends on the job. Per square foot is predictable for larger builds. Hourly works better for small or scope-variable jobs. A flat project quote is the easiest to compare across providers.
4. What should a post-construction cleaning quote include?
The pricing model, which phases are covered, whether debris haul-away and interior windows are included, and the minimum charge. Anything left vague should be confirmed in writing before booking.
5. Does CR Maids offer post-construction cleaning in Castle Rock and Denver?
Yes. CR Maids provides post-construction cleaning across Castle Rock, Denver, Parker, and Highlands Ranch with all supplies and a satisfaction guarantee. Call 720-713-1920 for a project-specific quote.
6. How do I compare post-construction cleaning quotes fairly?
Normalize quotes to the same scope. Confirm pricing model, phases included, debris removal, and minimum charge before comparing numbers. Verify insurance and reviews before committing to the lowest bid.

Karina Cohen is the owner of CR Maids, a local cleaning company serving the Greater Denver area. With a background as a global executive in fashion, software, retail, and financial services, she has led business strategy, mergers and acquisitions, and cross-cultural teams across the US, Europe, and Asia.
Karina holds a Global Executive MBA from Duke University’s Fuqua School of Business and a Bachelor of Science in Finance and Marketing from Fordham University. She brings this strategic expertise into CR Maids, where her mission goes beyond spotless homes—she is committed to empowering her team, creating financial security, and giving back to the community.
When she’s not leading CR Maids, Karina homeschools her daughter, serves on the board of Duke University Colorado, and supports initiatives that strengthen families and small businesses.
